Page 180 - Xmo Strata - Bulletin Archive
P. 180

Page 1 of 3




                        Health, Safety & Environmental Bulletin No 81

                                          13 March 2008 – S Martin


                                   Xmo Strata / Xmo Veritas Site Rules



         The following rules are designed to enforce and educate our workforce to latest statutory regulations and
         Company policy and should be carried in company vehicles at all times.

             1.  The lead installer allocated a job site is deemed to be the person in charge of all other persons either
                directly or indirectly employed by the company on that site.
             2.  Safety  helmets  (EN397),  safety  glasses  (EN166  3B),  gloves  (EN388),  hi-visibility  vests  (EN471),  &
                ankle  high  steel  toe  cap  boots  (EN345  S1)  must  be  worn  at  all  times  on  all  contracts.  Harnesses
                (EN361) must be worn when working in MEWP’s  and must be secured to a suitable anchor position.

             3.  Hearing  protection  must  be  worn  when  noise  levels  exceed  85dBA  (when  you  have  to  raise  your
                voice  to  be  heard  by  somebody  2m  away).    It  is  also  a  company  recommendation  that  hearing
                protection  is  worn  where  noise  levels  exceed  80dB.  (Note  that  for  guidance  purposes  noise  level
                increases  on  a  logarithmic  scale,  therefore  the  level  doubles for each 3dBA increase).  Where noise
                levels exceed 95dBA (noise at a night club bar), double protection must be used, i.e. both ear plugs
                and ear muffs.  If you have any doubts about the sound levels on any site, or whilst using any plant /
                equipment, contact your supervisor.
             4.  All  plant  and  machinery  must  NOT  be  moved  unless  one of team acts as the banksmen and 360°
                sightlines are kept – this rule applies to the reversing of any vehicle.  Do not allow ANY Xmo Strata /
                Xmo Veritas, Sub Contractor or Supplier’s vehicle to enter the site blindly.
             5.  Always isolate plant, lock up containers & waste skips and leave keys in the shop (note the name of
                the person to whom you give the keys).  Ensure all Heras fencing and other materials to be collected
                later are stacked safely and neatly and away from any emergency exits.
             6.  All  plant  or  machinery  must  be  operated  and stored within a fenced off area – always maintain a
                physical barrier  between the workplace and site traffic.
             7.  Always  ensure  600mm  distance  between  moving  machinery  and  a  fixed  obstruction  (trapping
                hazard)  –  if  unable  to  fence  off,  restrict  the  free  passage  of  persons  /  third  parties  by  placing  a
                person to act as a guard.  When raising a scissor lift or cherry picker under a soffit, be aware of the
                trapping  hazard  that  may  be  present.    The  lead  installer  must  nominate  a  competent  person  to
                operate the equipment, the nominated person will not operate the plant unless all other persons are
                clear of any pinch point.

             8.  Some  sites  are  declared  a  high  fire  risk  due  to  free  passage  of  persons  across  the  site.    In  these
                circumstances,  closed  waste  skips  will  be  sent  to  site  –  always  keep  these  doors  shut  &  locked.
                Always  keep  paper  and  other  flammable  materials  in  the  lockable container.  If an open skip has
                been  sent  to  site,  store  the  waste  paper  out  of  sight  and  dispose  into  skip  just  before  the  skip  is
                removed from site.
             9.  Always  complete  a  Work  at  Height  Checklist  before  working  on  any  access  equipment.  This
                includes steps, ladders, MEWPs, Towers, Scaffolds etc.
                 C:\Users\JMartin\OneDrive  - Xmo Strata LTD\Desktop\temp  bulletins\Bulletin
                 Archive\Health, Safety & Environmental  Bulletin No 81 - Revised Site rules - Mar 08.doc
   175   176   177   178   179   180   181   182   183   184   185