                        Health, Safety & Environmental Bulletin No 35

                                        27 February 2007 – S Martin


                                   Xmo Strata / Xmo Veritas Site Rules



         The following rules are designed to enforce and educate our workforce to latest statutory regulations and
         Company policy.
             1.  The lead installer allocated a job site is deemed to be the person in charge of all other persons either
                directly or indirectly employed by the company on that site, the lead installer must give this safety
                bulletin (and others sent to him) as a TBT to all persons, prior to commencing work and ensure that
                it signed and dated by them.

             2.  Safety  helmets,  safety  glasses,  gloves,  hi-visibility  vests,  &  ankle  high  steel  toe  cap boots must be
                worn at all times on all contracts.

             3.  Hearing protection must be worn when noise levels exceed 85dB (when you have to raise your voice
                to  be  heard  by  somebody  2m  away).    Where  noise  levels exceed 95dB (noise at a night club bar),
                double protection must be used, i.e. both ear plugs and ear muffs.  If you have any doubts about the
                sound levels on any site, or whilst using any plant / equipment, contact your supervisor.
             4.  All  plant  and  machinery  must  NOT  be  moved  unless  one of team acts as the banksmen and 360°
                sightlines are kept – this rule applies to the reversing of any vehicle.  Do not allow ANY Xmo Strata /
                Xmo Veritas, Sub Contractor or Supplier’s vehicle to enter the site blindly.
             5.  Always isolate plant, lock up containers & waste skips and leave keys in the shop (note shop persons
                name who keys handed to).
             6.  All  plant  or  machinery  to be operated within an exclusion zone, within a fenced off area – always
                maintain a physical barrier  between workplace and site traffic.
             7.  Always  ensure  600mm  distance  between  moving  machinery  and  a  fixed  obstruction  (trapping
                hazard)  –  if  unable  to  fence  off,  restrict  the  free  passage  of  persons  /  third  parties  by  placing  a
                person to act as a guard.  When raising a scissor lift or cherry picker under a soffit, be aware of the
                trapping  hazard  that  may  be  present.    The  lead  installer  must  nominate  a  person  to  operate  the
                equipment, the nominated person will not operate the plant unless all other persons are clear of any
                pinch point.
             8.  Some  sites  are  declared  a  high  fire  risk  due  to  free  passage  of  persons  across  the  site.    In  these
                circumstances,  closed  waste  skips  will  be  sent  to  site  –  always  keep  these  doors  shut  &  locked.
                Always  keep  paper  and  other  flammable  materials  in  the  lockable container.  If an open skip has
                been  sent  to  site,  store  the  waste  paper  out  of  sight  and  dispose  into  skip  just  before  the  skip  is
                removed from site.

             9.  Always  complete  a  Work  at  Height Checklist before working on any access equipment  at a height
                over 2m from the ground.  This includes steps, ladders, MEWPs,  Towers, Scaffolds etc.




                 C:\Users\JMartin\OneDrive  - Xmo Strata LTD\Desktop\temp  bulletins\Bulletin
                 Archive\Health, Safety & Environmental  Bulletin No 35 Revised Site rules - Feb 07.doc
   81   82   83   84   85   86   87   88   89   90   91