Safety, Health, Environmental & Quality Bulletin No 667

                                                     11 April 2019



                                    Incorrect Wiring of Illuminated Signs



            Please see below photograph of a blown letter on the “Jamie Oliver Deli by Shell” illuminated hanging
            sign at Shell Newark.

            We were called to investigate a report of one of the letters not illuminating,  upon  investigation  it was
            found  that the 12V  sign had been connected direct to 230V mains supply and as such it blew the letter
            resulting in needing to replace the letter.

            Please be careful when making  connections  to ensure that letters are wired into the transformer  before
            connecting  to the mains supply.  In order to rectify this it required two visits, one to investigate and one
            to repair along with taking  a full set of letters from stock in order to use one letter.  We are aware on
            occasion that the connections  to the mains supply are made by  others after we leave site. This bulletin
            will also  be  shared  with  the  Principle Contractors  we  will ask  them  to  distribute  to  the  Electrical
            contractors to ensure that they  check that there is a transformer in place before connecting  power to the
            sign.  The cables from  the  illuminated  letters run  up the  box section and into the  ceiling void, so any
            transformers would be visible above the ceiling tiles.